Bw 8 Ml over Hcfcd Ditch A-120-00-00
GoodHarris County, Texas · 3.25 MI E of SH 35 · Structure no. 121020325604361
- Built
- 1997
- 28 years old, rebuilt 2018
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 216 ft
- 3 main spans
- Daily traffic
- 93,232
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Bw 8 Ml over Hcfcd Ditch A-120-00-00 is a prestressed concrete stringer/multi-beam or girder carrying Bw 8 Ml over Hcfcd Ditch A-120-00-00 in Harris County, Texas. It was built in 1997 and reconstructed in 2018, so it is 28 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 93,232 vehicles a day, roughly 9% of them trucks, projected to reach 136,119 by 2042. The structure is 216 ft (65.8 m) long and 143 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bw 8 Ml over Hcfcd Ditch A-120-00-00 built?
It was built in 1997, making it 28 years old in 2025. It was reconstructed in 2018.
What condition is Bw 8 Ml over Hcfcd Ditch A-120-00-00 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Bw 8 Ml over Hcfcd Ditch A-120-00-00 carry?
About 93,232 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is Bw 8 Ml over Hcfcd Ditch A-120-00-00?
The structure is 216 ft (65.8 m) long with a longest span of 75 ft (22.9 m) and a deck 143 ft wide.
Who owns Bw 8 Ml over Hcfcd Ditch A-120-00-00?
It is owned by the State Highway Agency and maintained by the Local Toll Authority.