US Bridges

Fuqua ST EB over Hcfcd A120-03-00

Fair

Harris County, Texas · 0.1 MI W of Beamer · Structure no. 121020B25897644

Built
1980
45 years old
Condition
Fair
inspected September 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
58 ft
1 main span
Daily traffic
8,115
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Fuqua ST EB over Hcfcd A120-03-00 is a prestressed concrete box beam or girders - multiple carrying Fuqua ST EB over Hcfcd A120-03-00 in Harris County, Texas. It was built in 1980, so it is 45 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 8,115 vehicles a day, roughly 5% of them trucks, projected to reach 8,925 by 2031. The structure is 58 ft (17.7 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFuqua ST EB
CrossesHcfcd A120-03-00
Location0.1 MI W of Beamer
RouteCity Street 0
StateTexas
Coordinates29.61133, -95.2304
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length58 ft (17.7 m)
Longest span56 ft (17.1 m)
Deck width34 ft (10.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,115 (2011)
Projected traffic8,925 by 2031
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$4,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Fuqua ST EB over Hcfcd A120-03-00 built?

It was built in 1980, making it 45 years old in 2025.

What condition is Fuqua ST EB over Hcfcd A120-03-00 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Fuqua ST EB over Hcfcd A120-03-00 carry?

About 8,115 vehicles per day (2011 count), of which roughly 5% are trucks.

How long is Fuqua ST EB over Hcfcd A120-03-00?

The structure is 58 ft (17.7 m) long with a longest span of 56 ft (17.1 m) and a deck 34 ft wide.

Who owns Fuqua ST EB over Hcfcd A120-03-00?

It is owned by the City or Municipal Highway Agency.