US Bridges

Fuqua RD EB over Hcfcd Unit A120-00-00

Fair

Harris County, Texas · 1.00 MI W of Beamer RD · Structure no. 121020B25897004

Built
1984
41 years old
Condition
Fair
inspected September 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
120 ft
3 main spans
Daily traffic
4,100
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Fuqua RD EB over Hcfcd Unit A120-00-00 is a prestressed concrete box beam or girders - multiple carrying Fuqua RD EB over Hcfcd Unit A120-00-00 in Harris County, Texas. It was built in 1984, so it is 41 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,100 vehicles a day, roughly 5% of them trucks, projected to reach 5,000 by 2031. The structure is 120 ft (36.6 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFuqua RD EB
CrossesHcfcd Unit A120-00-00
Location1.00 MI W of Beamer RD
RouteCity Street 0
StateTexas
Coordinates29.61108, -95.24478
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length120 ft (36.6 m)
Longest span40 ft (12.2 m)
Deck width34 ft (10.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,100 (2011)
Projected traffic5,000 by 2031
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$8,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Fuqua RD EB over Hcfcd Unit A120-00-00 built?

It was built in 1984, making it 41 years old in 2025.

What condition is Fuqua RD EB over Hcfcd Unit A120-00-00 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Fuqua RD EB over Hcfcd Unit A120-00-00 carry?

About 4,100 vehicles per day (2011 count), of which roughly 5% are trucks.

How long is Fuqua RD EB over Hcfcd Unit A120-00-00?

The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 34 ft wide.

Who owns Fuqua RD EB over Hcfcd Unit A120-00-00?

It is owned by the City or Municipal Highway Agency.