El Camino Real EB over Hcfcd Ditch
FairHarris County, Texas · 0.3 MI SE of Pineloch · Structure no. 121020B21814001
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected September 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 72 ft
- 2 main spans
- Daily traffic
- 4,885
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
El Camino Real EB over Hcfcd Ditch is a prestressed concrete slab carrying El Camino Real EB over Hcfcd Ditch in Harris County, Texas. It was built in 1985, so it is 40 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,885 vehicles a day, projected to reach 10 by 2028. The structure is 72 ft (21.9 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was El Camino Real EB over Hcfcd Ditch built?
It was built in 1985, making it 40 years old in 2025.
What condition is El Camino Real EB over Hcfcd Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does El Camino Real EB over Hcfcd Ditch carry?
About 4,885 vehicles per day (2010 count).
How long is El Camino Real EB over Hcfcd Ditch?
The structure is 72 ft (21.9 m) long with a longest span of 35 ft (10.7 m) and a deck 32 ft wide.
Who owns El Camino Real EB over Hcfcd Ditch?
It is owned by the City or Municipal Highway Agency.