US Bridges

Space Ctr Blvd WB over Hcfcd Ditch

FairPosted for load

Harris County, Texas · 0.25 MI SE of Pineloch DR · Structure no. 121020B60485002

Built
1985
40 years old
Condition
Fair
inspected October 2023
Type
Slab
Prestressed Concrete
Length
83 ft
3 main spans
Daily traffic
7,183
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Space Ctr Blvd WB over Hcfcd Ditch is a prestressed concrete slab carrying Space Ctr Blvd WB over Hcfcd Ditch in Harris County, Texas. It was built in 1985, so it is 40 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 7,183 vehicles a day, projected to reach 875 by 2030. The structure is 83 ft (25.3 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSpace Ctr Blvd WB
CrossesHcfcd Ditch
Location0.25 MI SE of Pineloch DR
RouteCity Street 0
StateTexas
Coordinates29.58121, -95.1279
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadUnknown
Structure length83 ft (25.3 m)
Longest span27 ft (8.2 m)
Deck width32 ft (9.8 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,183 (2022)
Projected traffic875 by 2030
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$5,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Space Ctr Blvd WB over Hcfcd Ditch built?

It was built in 1985, making it 40 years old in 2025.

What condition is Space Ctr Blvd WB over Hcfcd Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Space Ctr Blvd WB over Hcfcd Ditch carry?

About 7,183 vehicles per day (2022 count).

How long is Space Ctr Blvd WB over Hcfcd Ditch?

The structure is 83 ft (25.3 m) long with a longest span of 27 ft (8.2 m) and a deck 32 ft wide.

Who owns Space Ctr Blvd WB over Hcfcd Ditch?

It is owned by the City or Municipal Highway Agency.