Spur 330 EB FR over Hcfcd #0107-00-00
GoodHarris County, Texas · 3.30 MI SE of IH 10 · Structure no. 121020050807311
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected November 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 74 ft
- 1 main span
- Daily traffic
- 3,822
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
Spur 330 EB FR over Hcfcd #0107-00-00 is a prestressed concrete box beam or girders - multiple carrying Spur 330 EB FR over Hcfcd #0107-00-00 in Harris County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,822 vehicles a day, roughly 9% of them trucks, projected to reach 4,150 by 2033. The structure is 74 ft (22.6 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Spur 330 EB FR over Hcfcd #0107-00-00 built?
It was built in 2002, making it 23 years old in 2025.
What condition is Spur 330 EB FR over Hcfcd #0107-00-00 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Spur 330 EB FR over Hcfcd #0107-00-00 carry?
About 3,822 vehicles per day (2019 count), of which roughly 9% are trucks.
How long is Spur 330 EB FR over Hcfcd #0107-00-00?
The structure is 74 ft (22.6 m) long with a longest span of 74 ft (22.6 m) and a deck 46 ft wide.
Who owns Spur 330 EB FR over Hcfcd #0107-00-00?
It is owned by the State Highway Agency.