Spur 330 EB Ml over Hcfcd #0107-00-00
GoodHarris County, Texas · 3.30 MI SE of IH 10 · Structure no. 121020050807309
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected November 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 82 ft
- 1 main span
- Daily traffic
- 21,590
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
Spur 330 EB Ml over Hcfcd #0107-00-00 is a prestressed concrete box beam or girders - multiple carrying Spur 330 EB Ml over Hcfcd #0107-00-00 in Harris County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 21,590 vehicles a day, roughly 11% of them trucks, projected to reach 30,220 by 2033. The structure is 82 ft (25 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Spur 330 EB Ml over Hcfcd #0107-00-00 built?
It was built in 2002, making it 23 years old in 2025.
What condition is Spur 330 EB Ml over Hcfcd #0107-00-00 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Spur 330 EB Ml over Hcfcd #0107-00-00 carry?
About 21,590 vehicles per day (2013 count), of which roughly 11% are trucks.
How long is Spur 330 EB Ml over Hcfcd #0107-00-00?
The structure is 82 ft (25 m) long with a longest span of 82 ft (25 m) and a deck 60 ft wide.
Who owns Spur 330 EB Ml over Hcfcd #0107-00-00?
It is owned by the State Highway Agency.