US Bridges

SH 288 NB - IH 610 over SH 288 & IH 610

Good

Harris County, Texas · JCT IH 610 and SH 288 · Structure no. 121020027116757

Built
2019
6 years old
Condition
Good
inspected November 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,388 ft
11 main spans
Daily traffic
22,731
2015 count
Owner
State
State Highway Agency

About this bridge

SH 288 NB - IH 610 over SH 288 & IH 610 is a prestressed concrete stringer/multi-beam or girder carrying SH 288 NB - IH 610 over SH 288 & IH 610 in Harris County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,731 vehicles a day, roughly 10% of them trucks, projected to reach 1 by 1900. The structure is 1,388 ft (423.1 m) long and 43 ft wide.

CarriesSH 288 NB - IH 610
CrossesSH 288 & IH 610
LocationJCT IH 610 and SH 288
RouteInterstate 610
StateTexas
Coordinates29.68032, -95.38183
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans11
Design loadHL 93
Structure length1,388 ft (423.1 m)
Longest span138 ft (42.1 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deck17 ft (5.2 m)

Traffic and service

Average daily traffic22,731 (2015)
Projected traffic1 by 1900
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 288 NB - IH 610 over SH 288 & IH 610 built?

It was built in 2019, making it 6 years old in 2025.

What condition is SH 288 NB - IH 610 over SH 288 & IH 610 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.

How much traffic does SH 288 NB - IH 610 over SH 288 & IH 610 carry?

About 22,731 vehicles per day (2015 count), of which roughly 10% are trucks.

How long is SH 288 NB - IH 610 over SH 288 & IH 610?

The structure is 1,388 ft (423.1 m) long with a longest span of 138 ft (42.1 m) and a deck 43 ft wide.

Who owns SH 288 NB - IH 610 over SH 288 & IH 610?

It is owned by the State Highway Agency.