IH 610 EB over SH 288 Sbml
GoodHarris County, Texas · IH 610 at SH 288 · Structure no. 121020027116751
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected December 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 72 ft
- 1 main span
- Daily traffic
- 78,320
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
IH 610 EB over SH 288 Sbml is a prestressed concrete box beam or girders - multiple carrying IH 610 EB over SH 288 Sbml in Harris County, Texas. It was built in 2020, so it is 5 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 78,320 vehicles a day, roughly 10% of them trucks, projected to reach 90,600 by 2035. The structure is 72 ft (22 m) long and 73 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 610 EB over SH 288 Sbml built?
It was built in 2020, making it 5 years old in 2025.
What condition is IH 610 EB over SH 288 Sbml in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.
How much traffic does IH 610 EB over SH 288 Sbml carry?
About 78,320 vehicles per day (2015 count), of which roughly 10% are trucks.
How long is IH 610 EB over SH 288 Sbml?
The structure is 72 ft (22 m) long with a longest span of 72 ft (22 m) and a deck 73 ft wide.
Who owns IH 610 EB over SH 288 Sbml?
It is owned by the State Highway Agency.