IH 10 Wb/Ih 45 SB over IH 10 EB & IH45
FairHarris County, Texas · At IH 10 and IH 45 · Structure no. 121020027107355
- Built
- 1967
- 58 years old, rebuilt 1972
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,660 ft
- 5 main spans
- Daily traffic
- 71,520
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
IH 10 Wb/Ih 45 SB over IH 10 EB & IH45 is a steel continuous stringer/multi-beam or girder carrying IH 10 Wb/Ih 45 SB over IH 10 EB & IH45 in Harris County, Texas. It was built in 1967 and reconstructed in 1972, so it is 58 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 71,520 vehicles a day, roughly 9% of them trucks, projected to reach 100,610 by 2030. The structure is 1,660 ft (506 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 10 Wb/Ih 45 SB over IH 10 EB & IH45 built?
It was built in 1967, making it 58 years old in 2025. It was reconstructed in 1972.
What condition is IH 10 Wb/Ih 45 SB over IH 10 EB & IH45 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does IH 10 Wb/Ih 45 SB over IH 10 EB & IH45 carry?
About 71,520 vehicles per day (2010 count), of which roughly 9% are trucks.
How long is IH 10 Wb/Ih 45 SB over IH 10 EB & IH45?
The structure is 1,660 ft (506 m) long with a longest span of 129 ft (39.3 m) and a deck 31 ft wide.
Who owns IH 10 Wb/Ih 45 SB over IH 10 EB & IH45?
It is owned by the State Highway Agency.