FM 419 over East Cottonwood Creek
GoodFisher County, Texas · 2.35 MI S of FM 611 · Structure no. 080770098302019
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 65 ft
- 1 main span
- Daily traffic
- 207
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FM 419 over East Cottonwood Creek is a prestressed concrete stringer/multi-beam or girder carrying FM 419 over East Cottonwood Creek in Fisher County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 207 vehicles a day, roughly 14% of them trucks, projected to reach 250 by 2030. The structure is 65 ft (19.8 m) long and 44 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 419 over East Cottonwood Creek built?
It was built in 2023, making it 2 years old in 2025.
What condition is FM 419 over East Cottonwood Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does FM 419 over East Cottonwood Creek carry?
About 207 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is FM 419 over East Cottonwood Creek?
The structure is 65 ft (19.8 m) long with a longest span of 65 ft (19.8 m) and a deck 44 ft wide.
Who owns FM 419 over East Cottonwood Creek?
It is owned by the State Highway Agency.