US Bridges

US 67 over Trib of Lallah Br

Fair

Erath County, Texas · 0.92 MI W of SH 220 · Structure no. 020730025901056

Built
1953
72 years old, rebuilt 2021
Condition
Fair
inspected August 2024
Type
Culvert
Concrete
Length
27 ft
4 main spans
Daily traffic
2,211
2020 count
Owner
State
State Highway Agency

About this bridge

US 67 over Trib of Lallah Br is a concrete culvert carrying US 67 over Trib of Lallah Br in Erath County, Texas. It was built in 1953 and reconstructed in 2021, so it is 72 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,211 vehicles a day, roughly 21% of them trucks, projected to reach 3,170 by 2033. The structure is 27 ft (8.2 m) long and 66 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesUS 67
CrossesTrib of Lallah Br
Location0.92 MI W of SH 220
RouteU.S. Route 67
StateTexas
Coordinates32.15069, -97.93629
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadOther
Structure length27 ft (8.2 m)
Longest span6 ft (1.8 m)
Deck width66 ft (20 m)
Roadway width50 ft (15.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,211 (2020)
Projected traffic3,170 by 2033
Trucks21%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 67 over Trib of Lallah Br built?

It was built in 1953, making it 72 years old in 2025. It was reconstructed in 2021.

What condition is US 67 over Trib of Lallah Br in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does US 67 over Trib of Lallah Br carry?

About 2,211 vehicles per day (2020 count), of which roughly 21% are trucks.

How long is US 67 over Trib of Lallah Br?

The structure is 27 ft (8.2 m) long with a longest span of 6 ft (1.8 m) and a deck 66 ft wide.

Who owns US 67 over Trib of Lallah Br?

It is owned by the State Highway Agency.