US Bridges

US 67 over Trib of Lallah Br

Good

Erath County, Texas · 3.25 MI W of SH 220 · Structure no. 020730025901054

Built
1953
72 years old
Condition
Good
inspected August 2024
Type
Culvert
Concrete
Length
31 ft
4 main spans
Daily traffic
2,211
2020 count
Owner
State
State Highway Agency

About this bridge

US 67 over Trib of Lallah Br is a concrete culvert carrying US 67 over Trib of Lallah Br in Erath County, Texas. It was built in 1953, so it is 72 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,211 vehicles a day, roughly 21% of them trucks, projected to reach 3,170 by 2033. The structure is 31 ft (9.4 m) long. If it were closed, the detour would be 9.9 mi (16 km).

CarriesUS 67
CrossesTrib of Lallah Br
Location3.25 MI W of SH 220
RouteU.S. Route 67
StateTexas
Coordinates32.15153, -97.97507
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadOther
Structure length31 ft (9.4 m)
Longest span6 ft (1.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,211 (2020)
Projected traffic3,170 by 2033
Trucks21%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 67 over Trib of Lallah Br built?

It was built in 1953, making it 72 years old in 2025.

What condition is US 67 over Trib of Lallah Br in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does US 67 over Trib of Lallah Br carry?

About 2,211 vehicles per day (2020 count), of which roughly 21% are trucks.

How long is US 67 over Trib of Lallah Br?

The structure is 31 ft (9.4 m) long with a longest span of 6 ft (1.8 m).

Who owns US 67 over Trib of Lallah Br?

It is owned by the State Highway Agency.