US Bridges

Whittier DR over Playa Drain

Good

El Paso County, Texas · 0.50 MI W of SH 20 · Structure no. 240720B72540001

Built
1975
50 years old
Condition
Good
inspected May 2024
Type
Other
Prestressed Concrete
Length
45 ft
1 main span
Daily traffic
1,470
2010 count
Owner
City
City or Municipal Highway Agency

About this bridge

Whittier DR over Playa Drain is a prestressed concrete other carrying Whittier DR over Playa Drain in El Paso County, Texas. It was built in 1975, so it is 50 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,470 vehicles a day, roughly 2% of them trucks, projected to reach 1,851 by 2030. The structure is 45 ft (13.7 m) long and 56 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWhittier DR
CrossesPlaya Drain
Location0.50 MI W of SH 20
RouteCity Street 0
StateTexas
Coordinates31.70644, -106.35366
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length45 ft (13.7 m)
Longest span45 ft (13.7 m)
Deck width56 ft (17.1 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,470 (2010)
Projected traffic1,851 by 2030
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Whittier DR over Playa Drain built?

It was built in 1975, making it 50 years old in 2025.

What condition is Whittier DR over Playa Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Whittier DR over Playa Drain carry?

About 1,470 vehicles per day (2010 count), of which roughly 2% are trucks.

How long is Whittier DR over Playa Drain?

The structure is 45 ft (13.7 m) long with a longest span of 45 ft (13.7 m) and a deck 56 ft wide.

Who owns Whittier DR over Playa Drain?

It is owned by the City or Municipal Highway Agency.