US Bridges

Sl 375 over Water # 5

Good

El Paso County, Texas · 1.45 MI SE of US 85 · Structure no. 240720255204330

Built
2018
7 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
145 ft
1 main span
Daily traffic
38,368
2022 count
Owner
State
State Highway Agency

About this bridge

Sl 375 over Water # 5 is a prestressed concrete stringer/multi-beam or girder carrying Sl 375 over Water # 5 in El Paso County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 38,368 vehicles a day, roughly 7% of them trucks, projected to reach 53,715 by 2042. The structure is 145 ft (44.2 m) long and 89 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSl 375
CrossesWater # 5
Location1.45 MI SE of US 85
RouteState Highway 375
StateTexas
Coordinates31.79083, -106.52098
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length145 ft (44.2 m)
Longest span145 ft (44.2 m)
Deck width89 ft (27.1 m)
Roadway width84 ft (25.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic38,368 (2022)
Projected traffic53,715 by 2042
Trucks7%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sl 375 over Water # 5 built?

It was built in 2018, making it 7 years old in 2025.

What condition is Sl 375 over Water # 5 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Sl 375 over Water # 5 carry?

About 38,368 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is Sl 375 over Water # 5?

The structure is 145 ft (44.2 m) long with a longest span of 145 ft (44.2 m) and a deck 89 ft wide.

Who owns Sl 375 over Water # 5?

It is owned by the State Highway Agency.