US Bridges

Sl 375 over Water #2 and Access Road

Good

El Paso County, Texas · 1.85 MI SE of US 85 · Structure no. 240720255204307

Built
2018
7 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
473 ft
4 main spans
Daily traffic
29,182
2022 count
Owner
State
State Highway Agency

About this bridge

Sl 375 over Water #2 and Access Road is a prestressed concrete stringer/multi-beam or girder carrying Sl 375 over Water #2 and Access Road in El Paso County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 29,182 vehicles a day, roughly 6% of them trucks, projected to reach 40,855 by 2042. The structure is 473 ft (144.2 m) long and 89 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSl 375
CrossesWater #2 and Access Road
Location1.85 MI SE of US 85
RouteState Highway 375
StateTexas
Coordinates31.7924, -106.52283
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length473 ft (144.2 m)
Longest span134 ft (40.8 m)
Deck width89 ft (27.1 m)
Roadway width84 ft (25.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29,182 (2022)
Projected traffic40,855 by 2042
Trucks6%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sl 375 over Water #2 and Access Road built?

It was built in 2018, making it 7 years old in 2025.

What condition is Sl 375 over Water #2 and Access Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Sl 375 over Water #2 and Access Road carry?

About 29,182 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is Sl 375 over Water #2 and Access Road?

The structure is 473 ft (144.2 m) long with a longest span of 134 ft (40.8 m) and a deck 89 ft wide.

Who owns Sl 375 over Water #2 and Access Road?

It is owned by the State Highway Agency.