Loop 375 over Cebada Drain

Good

El Paso County, Texas · 200FT W Cordova Intnl Br · Structure no. 240720255204014

Built
1968
57 years old
Condition
Good
inspected July 2023
Type
Culvert
Concrete
Length
27 ft
4 main spans
Daily traffic
18,991
2019 count
Owner
State
State Highway Agency

About this bridge

Loop 375 over Cebada Drain is a concrete culvert carrying Loop 375 over Cebada Drain in El Paso County, Texas. It was built in 1968, so it is 57 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,991 vehicles a day, roughly 4% of them trucks, projected to reach 46,810 by 2033. The structure is 27 ft (8.2 m) long.

CarriesLoop 375
CrossesCebada Drain
Location200FT W Cordova Intnl Br
RouteState Highway 375
StateTexas
Coordinates31.76536, -106.45198
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20
Structure length27 ft (8.2 m)
Longest span6 ft (1.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,991 (2019)
Projected traffic46,810 by 2033
Trucks4%
Lanes on structure10
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Loop 375 over Cebada Drain built?

It was built in 1968, making it 57 years old in 2025.

What condition is Loop 375 over Cebada Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Loop 375 over Cebada Drain carry?

About 18,991 vehicles per day (2019 count), of which roughly 4% are trucks.

How long is Loop 375 over Cebada Drain?

The structure is 27 ft (8.2 m) long with a longest span of 6 ft (1.8 m).

Who owns Loop 375 over Cebada Drain?

It is owned by the State Highway Agency.