US Bridges

Palmyra Road over Red Oak Creek

Good

Ellis County, Texas · 0.90 MI NW of IH45 Bus · Structure no. 180710AA0571001

Built
2005
20 years old
Condition
Good
inspected December 2022
Type
Other
Prestressed Concrete
Length
85 ft
1 main span
Daily traffic
615
2019 count
Owner
County
County Highway Agency

About this bridge

Palmyra Road over Red Oak Creek is a prestressed concrete other carrying Palmyra Road over Red Oak Creek in Ellis County, Texas. It was built in 2005, so it is 20 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 615 vehicles a day, projected to reach 861 by 2041. The structure is 85 ft (25.9 m) long and 30 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesPalmyra Road
CrossesRed Oak Creek
Location0.90 MI NW of IH45 Bus
RouteCounty Highway 0
StateTexas
Coordinates32.45052, -96.67087
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2022
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHL 93
Structure length85 ft (25.9 m)
Longest span35 ft (10.7 m)
Deck width30 ft (9.2 m)
Roadway width28 ft (8.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic615 (2019)
Projected traffic861 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Palmyra Road over Red Oak Creek built?

It was built in 2005, making it 20 years old in 2025.

What condition is Palmyra Road over Red Oak Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.

How much traffic does Palmyra Road over Red Oak Creek carry?

About 615 vehicles per day (2019 count).

How long is Palmyra Road over Red Oak Creek?

The structure is 85 ft (25.9 m) long with a longest span of 35 ft (10.7 m) and a deck 30 ft wide.

Who owns Palmyra Road over Red Oak Creek?

It is owned by the County Highway Agency.