US Bridges

FM 8 over Ellison Creek

Fair

Eastland County, Texas · 3.45 MI SW of SH 16 · Structure no. 230680055001019

Built
1959
66 years old
Condition
Fair
inspected February 2024
Type
Slab
Concrete
Length
79 ft
3 main spans
Daily traffic
685
2020 count
Owner
State
State Highway Agency

About this bridge

FM 8 over Ellison Creek is a concrete slab carrying FM 8 over Ellison Creek in Eastland County, Texas. It was built in 1959, so it is 66 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 685 vehicles a day, roughly 13% of them trucks, projected to reach 825 by 2038. The structure is 79 ft (24.1 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesFM 8
CrossesEllison Creek
Location3.45 MI SW of SH 16
RouteState Highway 8
StateTexas
Coordinates32.25184, -98.60301
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46 US tons
Inventory rating28 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadOther
Structure length79 ft (24.1 m)
Longest span26 ft (7.9 m)
Deck width28 ft (8.5 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic685 (2020)
Projected traffic825 by 2038
Trucks13%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 8 over Ellison Creek built?

It was built in 1959, making it 66 years old in 2025.

What condition is FM 8 over Ellison Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does FM 8 over Ellison Creek carry?

About 685 vehicles per day (2020 count), of which roughly 13% are trucks.

How long is FM 8 over Ellison Creek?

The structure is 79 ft (24.1 m) long with a longest span of 26 ft (7.9 m) and a deck 28 ft wide.

Who owns FM 8 over Ellison Creek?

It is owned by the State Highway Agency.