US Bridges

FM 8 over Ellison Creek

Good

Eastland County, Texas · 0.10 MI SW of FM 571 · Structure no. 230680055001018

Built
1959
66 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
863
2020 count
Owner
State
State Highway Agency

About this bridge

FM 8 over Ellison Creek is a concrete culvert carrying FM 8 over Ellison Creek in Eastland County, Texas. It was built in 1959, so it is 66 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 863 vehicles a day, roughly 14% of them trucks, projected to reach 1,239 by 2038. The structure is 22 ft (6.7 m) long and 33 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesFM 8
CrossesEllison Creek
Location0.10 MI SW of FM 571
RouteState Highway 8
StateTexas
Coordinates32.22936, -98.64672
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadOther
Structure length22 ft (6.7 m)
Longest span10 ft (3 m)
Deck width33 ft (10.2 m)
Roadway width29 ft (8.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic863 (2020)
Projected traffic1,239 by 2038
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 8 over Ellison Creek built?

It was built in 1959, making it 66 years old in 2025.

What condition is FM 8 over Ellison Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does FM 8 over Ellison Creek carry?

About 863 vehicles per day (2020 count), of which roughly 14% are trucks.

How long is FM 8 over Ellison Creek?

The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m) and a deck 33 ft wide.

Who owns FM 8 over Ellison Creek?

It is owned by the State Highway Agency.