US Bridges

CO RD 386 over Wilson Draw

Good

Dickens County, Texas · 0.55 MI E of CR 341 · Structure no. 250630AA0118001

Built
2015
10 years old
Condition
Good
inspected September 2024
Type
Culvert
Concrete
Length
43 ft
4 main spans
Daily traffic
14
2022 count
Owner
County
County Highway Agency

About this bridge

CO RD 386 over Wilson Draw is a concrete culvert carrying CO RD 386 over Wilson Draw in Dickens County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14 vehicles a day, roughly 3% of them trucks, projected to reach 50 by 2030. The structure is 43 ft (13.1 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCO RD 386
CrossesWilson Draw
Location0.55 MI E of CR 341
RouteCounty Highway 0
StateTexas
Coordinates33.47218, -100.77971
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length43 ft (13.1 m)
Longest span10 ft (3 m)
Deck width34 ft (10.4 m)
Roadway width32 ft (9.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14 (2022)
Projected traffic50 by 2030
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$4,000
NavigationNo navigation control on waterway

Frequently asked questions

When was CO RD 386 over Wilson Draw built?

It was built in 2015, making it 10 years old in 2025.

What condition is CO RD 386 over Wilson Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does CO RD 386 over Wilson Draw carry?

About 14 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is CO RD 386 over Wilson Draw?

The structure is 43 ft (13.1 m) long with a longest span of 10 ft (3 m) and a deck 34 ft wide.

Who owns CO RD 386 over Wilson Draw?

It is owned by the County Highway Agency.