US Bridges

SH 70 over Duck Creek Relief

Fair

Dickens County, Texas · 2.05 MI W of SH 208 · Structure no. 250630010602048

Built
1981
44 years old
Condition
Fair
inspected March 2023
Type
Culvert
Concrete
Length
49 ft
5 main spans
Daily traffic
732
2020 count
Owner
State
State Highway Agency

About this bridge

SH 70 over Duck Creek Relief is a concrete culvert carrying SH 70 over Duck Creek Relief in Dickens County, Texas. It was built in 1981, so it is 44 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 732 vehicles a day, roughly 18% of them trucks, projected to reach 1,410 by 2033. The structure is 49 ft (14.9 m) long and 48 ft wide. If it were closed, the detour would be 19.9 mi (32 km).

CarriesSH 70
CrossesDuck Creek Relief
Location2.05 MI W of SH 208
RouteState Highway 70
StateTexas
Coordinates33.46027, -100.82084
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length49 ft (14.9 m)
Longest span9 ft (2.7 m)
Deck width48 ft (14.6 m)
Roadway width46 ft (13.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic732 (2020)
Projected traffic1,410 by 2033
Trucks18%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed19.9 mi (32 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 70 over Duck Creek Relief built?

It was built in 1981, making it 44 years old in 2025.

What condition is SH 70 over Duck Creek Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does SH 70 over Duck Creek Relief carry?

About 732 vehicles per day (2020 count), of which roughly 18% are trucks.

How long is SH 70 over Duck Creek Relief?

The structure is 49 ft (14.9 m) long with a longest span of 9 ft (2.7 m) and a deck 48 ft wide.

Who owns SH 70 over Duck Creek Relief?

It is owned by the State Highway Agency.