Hebron Pkwy over Timber Creek
FairDenton County, Texas · 0.05 MI E of IH 35E Nbfr · Structure no. 180610C00997001
- Built
- 1986
- 39 years old, rebuilt 1997
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 305 ft
- 3 main spans
- Daily traffic
- 18,751
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Hebron Pkwy over Timber Creek is a prestressed concrete stringer/multi-beam or girder carrying Hebron Pkwy over Timber Creek in Denton County, Texas. It was built in 1986 and reconstructed in 1997, so it is 39 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 18,751 vehicles a day, roughly 9% of them trucks, projected to reach 28,127 by 2042. The structure is 305 ft (93 m) long and 108 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hebron Pkwy over Timber Creek built?
It was built in 1986, making it 39 years old in 2025. It was reconstructed in 1997.
What condition is Hebron Pkwy over Timber Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Hebron Pkwy over Timber Creek carry?
About 18,751 vehicles per day (2022 count), of which roughly 9% are trucks.
How long is Hebron Pkwy over Timber Creek?
The structure is 305 ft (93 m) long with a longest span of 98 ft (29.9 m) and a deck 108 ft wide.
Who owns Hebron Pkwy over Timber Creek?
It is owned by the City or Municipal Highway Agency.