US Bridges

Hebron Pkwy over Timber Creek

Fair

Denton County, Texas · 0.05 MI E of IH 35E Nbfr · Structure no. 180610C00997001

Built
1986
39 years old, rebuilt 1997
Condition
Fair
inspected December 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
305 ft
3 main spans
Daily traffic
18,751
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Hebron Pkwy over Timber Creek is a prestressed concrete stringer/multi-beam or girder carrying Hebron Pkwy over Timber Creek in Denton County, Texas. It was built in 1986 and reconstructed in 1997, so it is 39 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 18,751 vehicles a day, roughly 9% of them trucks, projected to reach 28,127 by 2042. The structure is 305 ft (93 m) long and 108 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesHebron Pkwy
CrossesTimber Creek
Location0.05 MI E of IH 35E Nbfr
RouteCity Street 0
StateTexas
Coordinates33.0088, -96.97022
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length305 ft (93 m)
Longest span98 ft (29.9 m)
Deck width108 ft (32.8 m)
Roadway width90 ft (27.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,751 (2022)
Projected traffic28,127 by 2042
Trucks9%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$280,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Hebron Pkwy over Timber Creek built?

It was built in 1986, making it 39 years old in 2025. It was reconstructed in 1997.

What condition is Hebron Pkwy over Timber Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does Hebron Pkwy over Timber Creek carry?

About 18,751 vehicles per day (2022 count), of which roughly 9% are trucks.

How long is Hebron Pkwy over Timber Creek?

The structure is 305 ft (93 m) long with a longest span of 98 ft (29.9 m) and a deck 108 ft wide.

Who owns Hebron Pkwy over Timber Creek?

It is owned by the City or Municipal Highway Agency.