IH 35E Nbml over Timber Creek
FairDenton County, Texas · 2.60 MI NW of Dallas C/L · Structure no. 180610019602079
- Built
- 1957
- 68 years old, rebuilt 1983
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 322 ft
- 8 main spans
- Daily traffic
- 74,860
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35E Nbml over Timber Creek is a steel stringer/multi-beam or girder carrying IH 35E Nbml over Timber Creek in Denton County, Texas. It was built in 1957 and reconstructed in 1983, so it is 68 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 74,860 vehicles a day, roughly 8% of them trucks, projected to reach 103,920 by 2030. The structure is 322 ft (98.1 m) long and 73 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35E Nbml over Timber Creek built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1983.
What condition is IH 35E Nbml over Timber Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does IH 35E Nbml over Timber Creek carry?
About 74,860 vehicles per day (2019 count), of which roughly 8% are trucks.
How long is IH 35E Nbml over Timber Creek?
The structure is 322 ft (98.1 m) long with a longest span of 40 ft (12.2 m) and a deck 73 ft wide.
Who owns IH 35E Nbml over Timber Creek?
It is owned by the State Highway Agency.