DC SH121WB IH35NB over IH 35E NB Fr/Timber Crk
GoodDenton County, Texas · IH35 / SH121 Interchange · Structure no. 180610019602512
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 2,669 ft
- 23 main spans
- Daily traffic
- 4,300
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
DC SH121WB IH35NB over IH 35E NB Fr/Timber Crk is a prestressed concrete stringer/multi-beam or girder carrying DC SH121WB IH35NB over IH 35E NB Fr/Timber Crk in Denton County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,300 vehicles a day, roughly 35% of them trucks, projected to reach 6,500 by 2030. The structure is 2,669 ft (813.5 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was DC SH121WB IH35NB over IH 35E NB Fr/Timber Crk built?
It was built in 2019, making it 6 years old in 2025.
What condition is DC SH121WB IH35NB over IH 35E NB Fr/Timber Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does DC SH121WB IH35NB over IH 35E NB Fr/Timber Crk carry?
About 4,300 vehicles per day (2010 count), of which roughly 35% are trucks.
How long is DC SH121WB IH35NB over IH 35E NB Fr/Timber Crk?
The structure is 2,669 ft (813.5 m) long with a longest span of 125 ft (38.1 m) and a deck 28 ft wide.
Who owns DC SH121WB IH35NB over IH 35E NB Fr/Timber Crk?
It is owned by the State Highway Agency and maintained by the Private (other than railroad).