DC IH35SB SH121EB over IH35E/SH121/TIMBER Crk
GoodDenton County, Texas · IH 35/SH 121 Interchange · Structure no. 180610019602510
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 2,076 ft
- 2 main spans
- Daily traffic
- 6,000
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
DC IH35SB SH121EB over IH35E/SH121/TIMBER Crk is a steel stringer/multi-beam or girder carrying DC IH35SB SH121EB over IH35E/SH121/TIMBER Crk in Denton County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,000 vehicles a day, roughly 3% of them trucks, projected to reach 8,600 by 2030. The structure is 2,076 ft (632.8 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was DC IH35SB SH121EB over IH35E/SH121/TIMBER Crk built?
It was built in 2019, making it 6 years old in 2025.
What condition is DC IH35SB SH121EB over IH35E/SH121/TIMBER Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does DC IH35SB SH121EB over IH35E/SH121/TIMBER Crk carry?
About 6,000 vehicles per day (2010 count), of which roughly 3% are trucks.
How long is DC IH35SB SH121EB over IH35E/SH121/TIMBER Crk?
The structure is 2,076 ft (632.8 m) long with a longest span of 220 ft (67.1 m) and a deck 28 ft wide.
Who owns DC IH35SB SH121EB over IH35E/SH121/TIMBER Crk?
It is owned by the State Highway Agency and maintained by the Private (other than railroad).