US Bridges

IH 35E Sbfr over Timber Creek

Fair

Denton County, Texas · 2.60 MI NW of Dallas C/L · Structure no. 180610019602249

Built
1983
42 years old
Condition
Fair
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
320 ft
4 main spans
Daily traffic
6,450
2013 count
Owner
State
State Highway Agency

About this bridge

IH 35E Sbfr over Timber Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 35E Sbfr over Timber Creek in Denton County, Texas. It was built in 1983, so it is 42 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,450 vehicles a day, roughly 7% of them trucks, projected to reach 9,030 by 2033. The structure is 320 ft (97.5 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 35E Sbfr
CrossesTimber Creek
Location2.60 MI NW of Dallas C/L
StateTexas
Coordinates33.01049, -96.97783
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length320 ft (97.5 m)
Longest span80 ft (24.4 m)
Deck width36 ft (11 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,450 (2013)
Projected traffic9,030 by 2033
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 35E Sbfr over Timber Creek built?

It was built in 1983, making it 42 years old in 2025.

What condition is IH 35E Sbfr over Timber Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does IH 35E Sbfr over Timber Creek carry?

About 6,450 vehicles per day (2013 count), of which roughly 7% are trucks.

How long is IH 35E Sbfr over Timber Creek?

The structure is 320 ft (97.5 m) long with a longest span of 80 ft (24.4 m) and a deck 36 ft wide.

Who owns IH 35E Sbfr over Timber Creek?

It is owned by the State Highway Agency.