US Bridges

US 377 over SH 114 Business

Good

Denton County, Texas · 0.70 MI S of SH 114 · Structure no. 180610008103315

Built
2021
4 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
93 ft
1 main span
Daily traffic
13,289
2020 count
Owner
State
State Highway Agency

About this bridge

US 377 over SH 114 Business is a prestressed concrete stringer/multi-beam or girder carrying US 377 over SH 114 Business in Denton County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,289 vehicles a day, roughly 5% of them trucks, projected to reach 18,605 by 2040. The structure is 93 ft (28.2 m) long and 81 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 377
CrossesSH 114 Business
Location0.70 MI S of SH 114
RouteU.S. Route 377
StateTexas
Coordinates33.0046, -97.22731
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length93 ft (28.2 m)
Longest span93 ft (28.2 m)
Deck width81 ft (24.7 m)
Roadway width79 ft (24.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,289 (2020)
Projected traffic18,605 by 2040
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byOther State Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 377 over SH 114 Business built?

It was built in 2021, making it 4 years old in 2025.

What condition is US 377 over SH 114 Business in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does US 377 over SH 114 Business carry?

About 13,289 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is US 377 over SH 114 Business?

The structure is 93 ft (28.2 m) long with a longest span of 93 ft (28.2 m) and a deck 81 ft wide.

Who owns US 377 over SH 114 Business?

It is owned by the State Highway Agency and maintained by the Other State Agency.