US Bridges

Royal LN EB over Hackberry Creek

Fair

Dallas County, Texas · 0.3 MI SE of SH 161/PGBT · Structure no. 180570D07710030

Built
1997
28 years old
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
240 ft
3 main spans
Daily traffic
5,490
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Royal LN EB over Hackberry Creek is a prestressed concrete stringer/multi-beam or girder carrying Royal LN EB over Hackberry Creek in Dallas County, Texas. It was built in 1997, so it is 28 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,490 vehicles a day, projected to reach 33,027 by 2031. The structure is 240 ft (73.2 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRoyal LN EB
CrossesHackberry Creek
Location0.3 MI SE of SH 161/PGBT
RouteCity Street 0
StateTexas
Coordinates32.89589, -96.96443
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length240 ft (73.2 m)
Longest span80 ft (24.4 m)
Deck width52 ft (16 m)
Roadway width38 ft (11.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,490 (2022)
Projected traffic33,027 by 2031
Trucks0%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$23,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Royal LN EB over Hackberry Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is Royal LN EB over Hackberry Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Royal LN EB over Hackberry Creek carry?

About 5,490 vehicles per day (2022 count).

How long is Royal LN EB over Hackberry Creek?

The structure is 240 ft (73.2 m) long with a longest span of 80 ft (24.4 m) and a deck 52 ft wide.

Who owns Royal LN EB over Hackberry Creek?

It is owned by the City or Municipal Highway Agency.