Belt Line RD SB over Bear Creek Relief
GoodDallas County, Texas · 0.3 MI S of Oakdale RD · Structure no. 180570D00570045
- Built
- 2007
- 18 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 648 ft
- 9 main spans
- Daily traffic
- 13,319
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Belt Line RD SB over Bear Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying Belt Line RD SB over Bear Creek Relief in Dallas County, Texas. It was built in 2007, so it is 18 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,319 vehicles a day, roughly 11% of them trucks, projected to reach 40,496 by 2041. The structure is 648 ft (197.5 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Belt Line RD SB over Bear Creek Relief built?
It was built in 2007, making it 18 years old in 2025.
What condition is Belt Line RD SB over Bear Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Belt Line RD SB over Bear Creek Relief carry?
About 13,319 vehicles per day (2014 count), of which roughly 11% are trucks.
How long is Belt Line RD SB over Bear Creek Relief?
The structure is 648 ft (197.5 m) long with a longest span of 72 ft (21.9 m) and a deck 59 ft wide.
Who owns Belt Line RD SB over Bear Creek Relief?
It is owned by the City or Municipal Highway Agency.