Belt Line RD NB over Bear Creek Relief
FairDallas County, Texas · 0.3 MI S of Oakdale RD · Structure no. 180570D00570007
- Built
- 2007
- 18 years old
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 648 ft
- 9 main spans
- Daily traffic
- 11,843
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Belt Line RD NB over Bear Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying Belt Line RD NB over Bear Creek Relief in Dallas County, Texas. It was built in 2007, so it is 18 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,843 vehicles a day, roughly 11% of them trucks, projected to reach 40,496 by 2041. The structure is 648 ft (197.5 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Belt Line RD NB over Bear Creek Relief built?
It was built in 2007, making it 18 years old in 2025.
What condition is Belt Line RD NB over Bear Creek Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Belt Line RD NB over Bear Creek Relief carry?
About 11,843 vehicles per day (2019 count), of which roughly 11% are trucks.
How long is Belt Line RD NB over Bear Creek Relief?
The structure is 648 ft (197.5 m) long with a longest span of 72 ft (21.9 m) and a deck 59 ft wide.
Who owns Belt Line RD NB over Bear Creek Relief?
It is owned by the City or Municipal Highway Agency.