Pioneer RD over South Mesquite Creek
GoodDallas County, Texas · 0.70 MI NE of Belt Line · Structure no. 180570C02345001
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected February 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 320 ft
- 6 main spans
- Daily traffic
- 8,456
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Pioneer RD over South Mesquite Creek is a prestressed concrete box beam or girders - multiple carrying Pioneer RD over South Mesquite Creek in Dallas County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,456 vehicles a day, roughly 2% of them trucks, projected to reach 7,500 by 2031. The structure is 320 ft (97.5 m) long and 56 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pioneer RD over South Mesquite Creek built?
It was built in 2013, making it 12 years old in 2025.
What condition is Pioneer RD over South Mesquite Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Pioneer RD over South Mesquite Creek carry?
About 8,456 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is Pioneer RD over South Mesquite Creek?
The structure is 320 ft (97.5 m) long with a longest span of 60 ft (18.3 m) and a deck 56 ft wide.
Who owns Pioneer RD over South Mesquite Creek?
It is owned by the City or Municipal Highway Agency.