Belt Line RD over S Mesquite Creek Trib
GoodDallas County, Texas · 0.5 MI SW of Bruton RD · Structure no. 180570N00595007
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 250 ft
- 3 main spans
- Daily traffic
- 11,045
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Belt Line RD over S Mesquite Creek Trib is a prestressed concrete stringer/multi-beam or girder carrying Belt Line RD over S Mesquite Creek Trib in Dallas County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,045 vehicles a day, roughly 15% of them trucks, projected to reach 15,000 by 2031. The structure is 250 ft (76.2 m) long and 107 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Belt Line RD over S Mesquite Creek Trib built?
It was built in 2004, making it 21 years old in 2025.
What condition is Belt Line RD over S Mesquite Creek Trib in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.
How much traffic does Belt Line RD over S Mesquite Creek Trib carry?
About 11,045 vehicles per day (2022 count), of which roughly 15% are trucks.
How long is Belt Line RD over S Mesquite Creek Trib?
The structure is 250 ft (76.2 m) long with a longest span of 85 ft (25.9 m) and a deck 107 ft wide.
Who owns Belt Line RD over S Mesquite Creek Trib?
It is owned by the City or Municipal Highway Agency.