US Bridges

Crist RD over Pgbt

Good

Dallas County, Texas · 0.5 MI E of SH 78 · Structure no. 180570296406036

Built
2010
15 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
329 ft
3 main spans
Daily traffic
5,391
2019 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Crist RD over Pgbt is a prestressed concrete stringer/multi-beam or girder carrying Crist RD over Pgbt in Dallas County, Texas. It was built in 2010, so it is 15 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,391 vehicles a day, roughly 1% of them trucks, projected to reach 10,000 by 2036. The structure is 329 ft (100.3 m) long and 73 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCrist RD
CrossesPgbt
Location0.5 MI E of SH 78
RouteCity Street 0
StateTexas
Coordinates32.94723, -96.61417
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3 (+1 approach)
Design loadHS 20
Structure length329 ft (100.3 m)
Longest span95 ft (29 m)
Deck width73 ft (22.3 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,391 (2019)
Projected traffic10,000 by 2036
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Crist RD over Pgbt built?

It was built in 2010, making it 15 years old in 2025.

What condition is Crist RD over Pgbt in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Crist RD over Pgbt carry?

About 5,391 vehicles per day (2019 count), of which roughly 1% are trucks.

How long is Crist RD over Pgbt?

The structure is 329 ft (100.3 m) long with a longest span of 95 ft (29 m) and a deck 73 ft wide.

Who owns Crist RD over Pgbt?

It is owned by the Local Toll Authority.