IH 635 Ebml over Hillcrest RD
GoodDallas County, Texas · 1.8 MI W of US 75 · Structure no. 180570237401553
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 220 ft
- 2 main spans
- Daily traffic
- 116,000
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
IH 635 Ebml over Hillcrest RD is a prestressed concrete stringer/multi-beam or girder carrying IH 635 Ebml over Hillcrest RD in Dallas County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 116,000 vehicles a day, roughly 10% of them trucks, projected to reach 162,400 by 2041. The structure is 220 ft (67.1 m) long and 130 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 635 Ebml over Hillcrest RD built?
It was built in 2013, making it 12 years old in 2025.
What condition is IH 635 Ebml over Hillcrest RD in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does IH 635 Ebml over Hillcrest RD carry?
About 116,000 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is IH 635 Ebml over Hillcrest RD?
The structure is 220 ft (67.1 m) long with a longest span of 110 ft (33.5 m) and a deck 130 ft wide.
Who owns IH 635 Ebml over Hillcrest RD?
It is owned by the State Highway Agency and maintained by the Private (other than railroad).