IH-635 Wbfr over Prk Ctrl & White Rock CR
GoodDallas County, Texas · 1 MI W of US75 Intersect. · Structure no. 180570237401501
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 593 ft
- 7 main spans
- Daily traffic
- 2,946
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
IH-635 Wbfr over Prk Ctrl & White Rock CR is a prestressed concrete stringer/multi-beam or girder carrying IH-635 Wbfr over Prk Ctrl & White Rock CR in Dallas County, Texas. It was built in 2014, so it is 11 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,946 vehicles a day, roughly 10% of them trucks, projected to reach 99,999 by 2030. The structure is 593 ft (180.7 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH-635 Wbfr over Prk Ctrl & White Rock CR built?
It was built in 2014, making it 11 years old in 2025.
What condition is IH-635 Wbfr over Prk Ctrl & White Rock CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does IH-635 Wbfr over Prk Ctrl & White Rock CR carry?
About 2,946 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is IH-635 Wbfr over Prk Ctrl & White Rock CR?
The structure is 593 ft (180.7 m) long with a longest span of 115 ft (35.1 m) and a deck 26 ft wide.
Who owns IH-635 Wbfr over Prk Ctrl & White Rock CR?
It is owned by the State Highway Agency and maintained by the Private (other than railroad).