IH 635 Wbml over US 75 and Cw Creek
FairDallas County, Texas · High Five Interchange · Structure no. 180570237401459
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,182 ft
- 9 main spans
- Daily traffic
- 107,463
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
IH 635 Wbml over US 75 and Cw Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 635 Wbml over US 75 and Cw Creek in Dallas County, Texas. It was built in 2005, so it is 20 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 107,463 vehicles a day, roughly 7% of them trucks, projected to reach 214,926 by 2040. The structure is 1,182 ft (360.3 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 635 Wbml over US 75 and Cw Creek built?
It was built in 2005, making it 20 years old in 2025.
What condition is IH 635 Wbml over US 75 and Cw Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does IH 635 Wbml over US 75 and Cw Creek carry?
About 107,463 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is IH 635 Wbml over US 75 and Cw Creek?
The structure is 1,182 ft (360.3 m) long with a longest span of 119 ft (36.3 m) and a deck 82 ft wide.
Who owns IH 635 Wbml over US 75 and Cw Creek?
It is owned by the State Highway Agency.