IH635/US75 Ramp NW over Cottonwood Creek
FairDallas County, Texas · 0.3 MI NE of IH 635 · Structure no. 180570237401485
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 248 ft
- 3 main spans
- Daily traffic
- 45,658
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
IH635/US75 Ramp NW over Cottonwood Creek is a prestressed concrete stringer/multi-beam or girder carrying IH635/US75 Ramp NW over Cottonwood Creek in Dallas County, Texas. It was built in 2005, so it is 20 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 45,658 vehicles a day, projected to reach 63,921 by 2040. The structure is 248 ft (75.6 m) long and 50 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH635/US75 Ramp NW over Cottonwood Creek built?
It was built in 2005, making it 20 years old in 2025.
What condition is IH635/US75 Ramp NW over Cottonwood Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does IH635/US75 Ramp NW over Cottonwood Creek carry?
About 45,658 vehicles per day (2020 count).
How long is IH635/US75 Ramp NW over Cottonwood Creek?
The structure is 248 ft (75.6 m) long with a longest span of 84 ft (25.6 m) and a deck 50 ft wide.
Who owns IH635/US75 Ramp NW over Cottonwood Creek?
It is owned by the State Highway Agency.