US Bridges

IH30 Conn to IH35E over Row

Good

Dallas County, Texas · IH 30 @ IH 35E · Structure no. 180570106804542

Built
2017
8 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
93 ft
1 main span
Daily traffic
56,591
2021 count
Owner
State
State Highway Agency

About this bridge

IH30 Conn to IH35E over Row is a prestressed concrete stringer/multi-beam or girder carrying IH30 Conn to IH35E over Row in Dallas County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 56,591 vehicles a day, roughly 7% of them trucks, projected to reach 84,886 by 2041. The structure is 93 ft (28.3 m) long and 70 ft wide.

CarriesIH30 Conn to IH35E
CrossesRow
LocationIH 30 @ IH 35E
RouteInterstate 30
StateTexas
Coordinates32.76884, -96.80459
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length93 ft (28.3 m)
Longest span93 ft (28.3 m)
Deck width70 ft (21.3 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic56,591 (2021)
Projected traffic84,886 by 2041
Trucks7%
Lanes on structure4
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesOther
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH30 Conn to IH35E over Row built?

It was built in 2017, making it 8 years old in 2025.

What condition is IH30 Conn to IH35E over Row in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does IH30 Conn to IH35E over Row carry?

About 56,591 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is IH30 Conn to IH35E over Row?

The structure is 93 ft (28.3 m) long with a longest span of 93 ft (28.3 m) and a deck 70 ft wide.

Who owns IH30 Conn to IH35E over Row?

It is owned by the State Highway Agency.