US Bridges

SH 114 over S Fk Hackberry Ck Relief

Fair

Dallas County, Texas · 0.5 MI SE of SH 161 · Structure no. 180570035304064

Built
1964
61 years old, rebuilt 1986
Condition
Fair
inspected January 2024
Type
Culvert
Concrete
Length
30 ft
3 main spans
Daily traffic
9,226
2023 count
Owner
State
State Highway Agency

About this bridge

SH 114 over S Fk Hackberry Ck Relief is a concrete culvert carrying SH 114 over S Fk Hackberry Ck Relief in Dallas County, Texas. It was built in 1964 and reconstructed in 1986, so it is 61 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,226 vehicles a day, roughly 7% of them trucks, projected to reach 127,100 by 2033. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH 114
CrossesS Fk Hackberry Ck Relief
Location0.5 MI SE of SH 161
RouteState Highway 114
StateTexas
Coordinates32.8915, -96.96477
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length30 ft (9.1 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,226 (2023)
Projected traffic127,100 by 2033
Trucks7%
Lanes on structure13
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 114 over S Fk Hackberry Ck Relief built?

It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1986.

What condition is SH 114 over S Fk Hackberry Ck Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does SH 114 over S Fk Hackberry Ck Relief carry?

About 9,226 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is SH 114 over S Fk Hackberry Ck Relief?

The structure is 30 ft (9.1 m) long with a longest span of 10 ft (3 m).

Who owns SH 114 over S Fk Hackberry Ck Relief?

It is owned by the State Highway Agency.