SP366 EB Off Rp B over SP 366 EB FR
FairDallas County, Texas · 0.2 MI SW of Akard ST · Structure no. 180570019607220
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 250 ft
- 2 main spans
- Daily traffic
- 15,770
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
SP366 EB Off Rp B over SP 366 EB FR is a steel continuous stringer/multi-beam or girder carrying SP366 EB Off Rp B over SP 366 EB FR in Dallas County, Texas. It was built in 1981, so it is 44 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,770 vehicles a day, roughly 5% of them trucks, projected to reach 22,080 by 2033. The structure is 250 ft (76.2 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SP366 EB Off Rp B over SP 366 EB FR built?
It was built in 1981, making it 44 years old in 2025.
What condition is SP366 EB Off Rp B over SP 366 EB FR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does SP366 EB Off Rp B over SP 366 EB FR carry?
About 15,770 vehicles per day (2013 count), of which roughly 5% are trucks.
How long is SP366 EB Off Rp B over SP 366 EB FR?
The structure is 250 ft (76.2 m) long with a longest span of 108 ft (32.9 m) and a deck 36 ft wide.
Who owns SP366 EB Off Rp B over SP 366 EB FR?
It is owned by the State Highway Agency.