35ESB Exp to 635EB over IH35ESB;HARRY Hines;crk
GoodDallas County, Texas · 0.7 MI N of IH 635 · Structure no. 180570019603495
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 2,160 ft
- 15 main spans
- Daily traffic
- 4,963
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
35ESB Exp to 635EB over IH35ESB;HARRY Hines;crk is a prestressed concrete stringer/multi-beam or girder carrying 35ESB Exp to 635EB over IH35ESB;HARRY Hines;crk in Dallas County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,963 vehicles a day, roughly 3% of them trucks, projected to reach 7,444 by 2041. The structure is 2,160 ft (658.4 m) long and 28 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 35ESB Exp to 635EB over IH35ESB;HARRY Hines;crk built?
It was built in 2018, making it 7 years old in 2025.
What condition is 35ESB Exp to 635EB over IH35ESB;HARRY Hines;crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does 35ESB Exp to 635EB over IH35ESB;HARRY Hines;crk carry?
About 4,963 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is 35ESB Exp to 635EB over IH35ESB;HARRY Hines;crk?
The structure is 2,160 ft (658.4 m) long with a longest span of 110 ft (33.6 m) and a deck 28 ft wide.
Who owns 35ESB Exp to 635EB over IH35ESB;HARRY Hines;crk?
It is owned by the State Highway Agency and maintained by the Private (other than railroad).