IH 35E Nbml over Furneaux Creek
GoodDallas County, Texas · 5.5 MI N of IH 635 · Structure no. 180570019603003
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 246 ft
- 3 main spans
- Daily traffic
- 86,726
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35E Nbml over Furneaux Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 35E Nbml over Furneaux Creek in Dallas County, Texas. It was built in 2003, so it is 22 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 86,726 vehicles a day, roughly 8% of them trucks, projected to reach 100,000 by 2035. The structure is 246 ft (75 m) long and 101 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35E Nbml over Furneaux Creek built?
It was built in 2003, making it 22 years old in 2025.
What condition is IH 35E Nbml over Furneaux Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does IH 35E Nbml over Furneaux Creek carry?
About 86,726 vehicles per day (2019 count), of which roughly 8% are trucks.
How long is IH 35E Nbml over Furneaux Creek?
The structure is 246 ft (75 m) long with a longest span of 82 ft (25 m) and a deck 101 ft wide.
Who owns IH 35E Nbml over Furneaux Creek?
It is owned by the State Highway Agency.