US Bridges

IH 30 Ebfr over Lake Ray Hubbard

Fair

Dallas County, Texas · 6.2 MI NE of IH 635 · Structure no. 180570000911498

Built
2023
2 years old
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
5,677 ft
43 main spans
Daily traffic
26,650
2023 count
Owner
State
State Highway Agency

About this bridge

IH 30 Ebfr over Lake Ray Hubbard is a prestressed concrete stringer/multi-beam or girder carrying IH 30 Ebfr over Lake Ray Hubbard in Dallas County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 26,650 vehicles a day, roughly 3% of them trucks, projected to reach 1 by 1900. The structure is 5,677 ft (1,730.4 m) long and 47 ft wide.

CarriesIH 30 Ebfr
CrossesLake Ray Hubbard
Location6.2 MI NE of IH 635
RouteInterstate 30
StateTexas
Coordinates32.86854, -96.53515
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans43
Design loadHL 93
Structure length5,677 ft (1,730.4 m)
Longest span140 ft (42.7 m)
Deck width47 ft (14.3 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,650 (2023)
Projected traffic1 by 1900
Trucks3%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 30 Ebfr over Lake Ray Hubbard built?

It was built in 2023, making it 2 years old in 2025.

What condition is IH 30 Ebfr over Lake Ray Hubbard in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does IH 30 Ebfr over Lake Ray Hubbard carry?

About 26,650 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is IH 30 Ebfr over Lake Ray Hubbard?

The structure is 5,677 ft (1,730.4 m) long with a longest span of 140 ft (42.7 m) and a deck 47 ft wide.

Who owns IH 30 Ebfr over Lake Ray Hubbard?

It is owned by the State Highway Agency.