US Bridges

Pgbt (SH190) DC02 over IH30 Wbfr & Pgbt Nbfr

Good

Dallas County, Texas · IH30 / Pgbt Interchange · Structure no. 180570000911459

Built
2012
13 years old
Condition
Good
inspected April 2024
Type
Box Beam or Girders - Multiple
Steel Continuous
Length
2,337 ft
2 main spans
Daily traffic
4,300
2012 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Pgbt (SH190) DC02 over IH30 Wbfr & Pgbt Nbfr is a steel continuous box beam or girders - multiple carrying Pgbt (SH190) DC02 over IH30 Wbfr & Pgbt Nbfr in Dallas County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,300 vehicles a day, roughly 5% of them trucks, projected to reach 5,400 by 2029. The structure is 2,337 ft (712.3 m) long and 28 ft wide.

CarriesPgbt (SH190) DC02
CrossesIH30 Wbfr & Pgbt Nbfr
LocationIH30 / Pgbt Interchange
StateTexas
Coordinates32.86096, -96.54923
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2 (+22 approach)
Design loadHS 20
Structure length2,337 ft (712.3 m)
Longest span163 ft (49.7 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,300 (2012)
Projected traffic5,400 by 2029
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pgbt (SH190) DC02 over IH30 Wbfr & Pgbt Nbfr built?

It was built in 2012, making it 13 years old in 2025.

What condition is Pgbt (SH190) DC02 over IH30 Wbfr & Pgbt Nbfr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Pgbt (SH190) DC02 over IH30 Wbfr & Pgbt Nbfr carry?

About 4,300 vehicles per day (2012 count), of which roughly 5% are trucks.

How long is Pgbt (SH190) DC02 over IH30 Wbfr & Pgbt Nbfr?

The structure is 2,337 ft (712.3 m) long with a longest span of 163 ft (49.7 m) and a deck 28 ft wide.

Who owns Pgbt (SH190) DC02 over IH30 Wbfr & Pgbt Nbfr?

It is owned by the Local Toll Authority.