IH 30 WB over Pgbt (sh 190)
FairDallas County, Texas · 4.95 MI NE of IH 635W · Structure no. 180570000911457
- Built
- 2012
- 13 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 480 ft
- 6 main spans
- Daily traffic
- 79,742
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
IH 30 WB over Pgbt (sh 190) is a prestressed concrete stringer/multi-beam or girder carrying IH 30 WB over Pgbt (sh 190) in Dallas County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 79,742 vehicles a day, roughly 11% of them trucks, projected to reach 95,820 by 2033. The structure is 480 ft (146.3 m) long and 83 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 30 WB over Pgbt (sh 190) built?
It was built in 2012, making it 13 years old in 2025.
What condition is IH 30 WB over Pgbt (sh 190) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does IH 30 WB over Pgbt (sh 190) carry?
About 79,742 vehicles per day (2019 count), of which roughly 11% are trucks.
How long is IH 30 WB over Pgbt (sh 190)?
The structure is 480 ft (146.3 m) long with a longest span of 80 ft (24.4 m) and a deck 83 ft wide.
Who owns IH 30 WB over Pgbt (sh 190)?
It is owned by the State Highway Agency.