US Bridges

CR 235 over S Leon River Draw

Good

Comanche County, Texas · 5.55 MI S of SH 16 · Structure no. 230470AA0258001

Built
2010
15 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
50 ft
1 main span
Daily traffic
50
2013 count
Owner
County
County Highway Agency

About this bridge

CR 235 over S Leon River Draw is a prestressed concrete stringer/multi-beam or girder carrying CR 235 over S Leon River Draw in Comanche County, Texas. It was built in 2010, so it is 15 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 70 by 2033. The structure is 50 ft (15.2 m) long and 26 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCR 235
CrossesS Leon River Draw
Location5.55 MI S of SH 16
RouteCounty Highway 235
StateTexas
Coordinates31.75424, -98.56557
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length50 ft (15.2 m)
Longest span50 ft (15.2 m)
Deck width26 ft (7.9 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2013)
Projected traffic70 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 235 over S Leon River Draw built?

It was built in 2010, making it 15 years old in 2025.

What condition is CR 235 over S Leon River Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does CR 235 over S Leon River Draw carry?

About 50 vehicles per day (2013 count).

How long is CR 235 over S Leon River Draw?

The structure is 50 ft (15.2 m) long with a longest span of 50 ft (15.2 m) and a deck 26 ft wide.

Who owns CR 235 over S Leon River Draw?

It is owned by the County Highway Agency.