US Bridges

FM 1476 over S Leon River

Fair

Comanche County, Texas · 0.32 MI E of SH 16 · Structure no. 230470103902011

Built
1954
71 years old
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
90 ft
3 main spans
Daily traffic
211
2023 count
Owner
State
State Highway Agency

About this bridge

FM 1476 over S Leon River is a concrete stringer/multi-beam or girder carrying FM 1476 over S Leon River in Comanche County, Texas. It was built in 1954, so it is 71 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 211 vehicles a day, roughly 3% of them trucks, projected to reach 220 by 2033. The structure is 90 ft (27.4 m) long and 25 ft wide. If it were closed, the detour would be 26.1 mi (42 km).

CarriesFM 1476
CrossesS Leon River
Location0.32 MI E of SH 16
RouteState Highway 1476
StateTexas
Coordinates31.7688, -98.52223
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating59 US tons
Inventory rating34.9 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadOther
Structure length90 ft (27.4 m)
Longest span30 ft (9.1 m)
Deck width25 ft (7.5 m)
Roadway width23 ft (6.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic211 (2023)
Projected traffic220 by 2033
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed26.1 mi (42 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 1476 over S Leon River built?

It was built in 1954, making it 71 years old in 2025.

What condition is FM 1476 over S Leon River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does FM 1476 over S Leon River carry?

About 211 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is FM 1476 over S Leon River?

The structure is 90 ft (27.4 m) long with a longest span of 30 ft (9.1 m) and a deck 25 ft wide.

Who owns FM 1476 over S Leon River?

It is owned by the State Highway Agency.