US Bridges

Peachwood DR over Trib Rush Creek

Good

Collin County, Texas · 0.08 MI N of Oak ST · Structure no. 180430ZA8955001

Built
2016
9 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
53 ft
3 main spans
Daily traffic
163
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Peachwood DR over Trib Rush Creek is a concrete culvert carrying Peachwood DR over Trib Rush Creek in Collin County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 163 vehicles a day, roughly 3% of them trucks, projected to reach 163 by 2041. The structure is 53 ft (16.2 m) long and 72 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPeachwood DR
CrossesTrib Rush Creek
Location0.08 MI N of Oak ST
RouteCity Street 0
StateTexas
Coordinates33.01492, -96.52767
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length53 ft (16.2 m)
Longest span10 ft (3 m)
Deck width72 ft (21.8 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic163 (2021)
Projected traffic163 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Peachwood DR over Trib Rush Creek built?

It was built in 2016, making it 9 years old in 2025.

What condition is Peachwood DR over Trib Rush Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Peachwood DR over Trib Rush Creek carry?

About 163 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is Peachwood DR over Trib Rush Creek?

The structure is 53 ft (16.2 m) long with a longest span of 10 ft (3 m) and a deck 72 ft wide.

Who owns Peachwood DR over Trib Rush Creek?

It is owned by the City or Municipal Highway Agency.