US Bridges

Dallas Pkwy SB over Trib Doe Branch

Good

Collin County, Texas · 0.90 MI N of US 380 · Structure no. 180430T03101001

Built
2020
5 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
65 ft
6 main spans
Daily traffic
8,709
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Dallas Pkwy SB over Trib Doe Branch is a concrete culvert carrying Dallas Pkwy SB over Trib Doe Branch in Collin County, Texas. It was built in 2020, so it is 5 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,709 vehicles a day, roughly 3% of them trucks, projected to reach 12,193 by 2039. The structure is 65 ft (19.8 m) long and 53 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesDallas Pkwy SB
CrossesTrib Doe Branch
Location0.90 MI N of US 380
RouteCity Street 0
StateTexas
Coordinates33.23227, -96.81958
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans6
Design loadHL 93
Structure length65 ft (19.8 m)
Longest span10 ft (3 m)
Deck width53 ft (16.2 m)
Roadway width35 ft (10.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,709 (2019)
Projected traffic12,193 by 2039
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Dallas Pkwy SB over Trib Doe Branch built?

It was built in 2020, making it 5 years old in 2025.

What condition is Dallas Pkwy SB over Trib Doe Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Dallas Pkwy SB over Trib Doe Branch carry?

About 8,709 vehicles per day (2019 count), of which roughly 3% are trucks.

How long is Dallas Pkwy SB over Trib Doe Branch?

The structure is 65 ft (19.8 m) long with a longest span of 10 ft (3 m) and a deck 53 ft wide.

Who owns Dallas Pkwy SB over Trib Doe Branch?

It is owned by the Town or Township Highway Agency.